06/29/18: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering the Turnpike) renovation of existing Toll Utility Building continues.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • No work planned.
Avenue E / Proposed Roundabout
  • During the week of 07/09/18, daytime lane closures will be utilized for clean up work between 53rd Street and 50th Street. This work will be supported by Bayonne Police as needed.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited.
Route 440 and Pulaski Street Intersection / Jughandle
  • During the week of 07/09/18, the new traffic signal and new traffic pattern will be implemented at Pulaski Street and Route 440 intersection.
Ramp Area East of Route 440
  • During the week of 07/09/18, the new traffic signal and new traffic pattern will be implemented at the intersection of Pulaski Street and Chosin Few Way and at the intersection of Chosin Few Way and Port Jersey Boulevard.

06/22/18: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering the Turnpike) renovation of existing Toll Utility Building continues.

Ramps between the Toll Plaza and the Hudson County Extension (HCE)

  • No work planned.
Avenue E / Proposed Roundabout
  • During the week of 06/25/18, daytime lane closures will be utilized for clean up work between 53rd Street and 50th Street. This work will be supported by Bayonne Police as needed.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited.
Route 440 and Pulaski Street Intersection / Jughandle
  • Continue traffic signal construction on Route 440.
Ramp Area East of Route 440
  • Continue traffic signal construction on Port Jersey Boulevard.

06/15/18: Construction Update

The following work is scheduled over the next three weeks:

Toll Plaza

  • East side (entering the Turnpike) renovation of existing Toll Utility Building continues.

Ramps between the Toll Plaza and the Hudson County Extension (HCE)

  • No work planned.

Avenue E / Proposed Roundabout

  • During the weeks of 06/18/18 through 06/25/18, daytime lane closures will be utilized for clean up work between 53rd Street and 50th Street. This work will be supported by Bayonne Police as needed.

Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)

  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited.

Route 440 and Pulaski Street Intersection / Jughandle

  • Continue traffic signal construction on Route 440.

Ramp Area East of Route 440

  • Continue traffic signal construction on Port Jersey Boulevard.

06/08/18: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering the Turnpike) renovation of existing Toll Utility Building continues.
  • During the evening of 06/11/18, nighttime Toll Lane closures, one lane at a time, will be utilized to to perform roadway striping work. Minor traffic impacts are expected. This work will be supported by State Police.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • No work planned.
Avenue E / Proposed Roundabout
  • During the weeks of 06/11/18 through 06/25/18, daytime lane closures will be utilized for clean up work between 53rd Street and 50th Street. This work will be supported by Bayonne Police as needed.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited.
Route 440 and Pulaski Street Intersection / Jughandle
  • Continue traffic signal construction on Route 440.
Ramp Area East of Route 440
  • Continue traffic signal construction on Port Jersey Boulevard.

06/01/18: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering the Turnpike) renovation of existing Toll Utility Building continues.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • No work planned.
Avenue E / Proposed Roundabout
  • During the weeks of 06/04/18 through 06/25/18, daytime lane closures will be utilized for clean up work between 53rd Street and 50th Street. This work will be supported by Bayonne Police as needed.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited.
Route 440 and Pulaski Street Intersection / Jughandle
  • Continue traffic signal construction on Route 440.
Ramp Area East of Route 440
  • Continue traffic signal construction on Port Jersey Boulevard.