09/29/17: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering 14A): renovation of existing Toll Utility Building continues.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • Local street level work at Garfield, Avenue C and JFK Boulevard bridges will resume in the Fall of 2017. This work will be supported by Jersey City and Bayonne Police as needed.
Avenue E / Proposed Roundabout
  • New roadway construction on Avenue E between 51st Street and 53rd Street continues.
  • New bridge construction activities continue.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Traffic was shifted onto the new Connector Bridge in a two-way temporary traffic pattern. Please CLICK HERE for graphic.
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited. Please CLICK HERE for shuttle bus pamphlet.
Route 440 and Pulaski Street Intersection / Jughandle
  • Ramp roadway construction continues.
  • Ramp structure construction to southbound Route 440 continues.
  • During the weekends of October 20-22 and October 27-29, 2017, there will be weekend lane closures on northbound and southbound Route 440 between Pulaski Street and Harbor Drive for asphalt paving work. Work will be supported by Bayonne Police.
Ramp Area East of Route 440
  • New ramp construction continues.

09/22/17: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering 14A): renovation of existing Toll Utility Building continues.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • Local street level work at Garfield, Avenue C and JFK Boulevard bridges will resume in the Fall of 2017. This work will be supported by Jersey City and Bayonne Police as needed.
Avenue E / Proposed Roundabout
  • New roadway construction on Avenue E between 51st Street and 53rd Street continues.
  • New bridge construction activities continue.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Traffic was shifted onto the new Connector Bridge in a two-way temporary traffic pattern. Please CLICK HERE for graphic.
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited. Please CLICK HERE for shuttle bus pamphlet.
Route 440 and Pulaski Street Intersection / Jughandle
  • Ramp roadway construction continues.
  • Ramp structure construction to southbound Route 440 continues.
  • During the weekends of October 20-22 and October 27-29, 2017, weekend lane closures on northbound and southbound Route 440 between Pulaski Street and Harbor Drive for asphalt paving work. Work will be supported by Bayonne Police.
Ramp Area East of Route 440
  • New ramp construction continues.

Other Turnpike Work: Weekend of 9/22/17-9/25/17

Weekend of 09/22/17 – 09/25/17
Hudson County Extension/Newark Bay Bridge Advisory
 
Westbound – Interchange 14A – 14: 
During the weekend of 09/22/17 – 09/25/17 the westbound Hudson County Extension between Interchange 14A and Interchange 14 (milepost N2.3 – N0.0), will be reduced to one lane from 9:00PM Friday to 5:00AM Monday. This work has been coordinated with westbound Pulaski Skyway and the Bayonne Bridge, both of which will remain open during peak periods Saturday and Sunday. This closing is necessary to address high priority and emergent bridge deck repairs in the westbound travel lanes.
Jersey City (Jersey Avenue – Interchange 14C)
Eastbound – Interchange 14C to Jersey Avenue:
During the weekend of 09/22/17 – 09/25/17 the eastbound Hudson County Extension between Interchange 14C and Jersey Avenue will be reduced to one lane from 8:00PM Friday to 5:00AM Monday. These closings are necessary to address high priority and emergent bridge deck repairs and resurfacing, which are required to maintain the eastbound roadway and shoulder lane during the Pulaski diversion.

09/15/17: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering 14A): renovation of existing Toll Utility Building continues.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • Local street level work at Garfield, Avenue C and JFK Boulevard bridges will resume in the Fall of 2017. This work will be supported by Jersey City and Bayonne Police as needed.

Avenue E / Proposed Roundabout
  • New roadway construction on Avenue E between 51st Street and 53rd Street continues.
  • New bridge construction activities continue.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Traffic was shifted onto the new Connector Bridge in a two-way temporary traffic pattern. Please CLICK HERE for graphic.
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited. Please CLICK HERE for shuttle bus pamphlet.
Route 440 and Pulaski Street Intersection / Jughandle
  • Ramp roadway construction continues.
  • Ramp structure construction to southbound Route 440 continues.
Ramp Area East of Route 440
  • New ramp construction continues.

09/08/17: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering 14A): renovation of existing Toll Utility Building continues.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • Local street level work at Garfield, Avenue C and JFK Boulevard bridges will resume in the Fall of 2017. This work will be supported by Jersey City and Bayonne Police as needed.

Avenue E / Proposed Roundabout
  • New roadway construction on Avenue E between 51st Street and 53rd Street continues.
  • New bridge construction activities continue.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Traffic was shifted onto the new Connector Bridge in a two-way temporary traffic pattern. Please CLICK HERE for graphic.
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited. Please CLICK HERE for shuttle bus pamphlet.
Route 440 and Pulaski Street Intersection / Jughandle
  • Ramp roadway construction continues.
  • Ramp structure construction to southbound Route 440 continues.
Ramp Area East of Route 440
  • New ramp construction continues.

09/01/17: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering 14A): renovation of existing Toll Utility Building continues.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • Local street level work at Garfield, Avenue C and JFK Boulevard bridges will resume in the Fall of 2017. This work will be supported by Jersey City and Bayonne Police as needed.

Avenue E / Proposed Roundabout
  • New roadway construction on Avenue E between 51st Street and 53rd Street continues.
  • New bridge construction activities continue.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Traffic was shifted onto the new Connector Bridge in a two-way temporary traffic pattern. Please CLICK HERE for graphic.
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited. Please CLICK HERE for shuttle bus pamphlet.
Route 440 and Pulaski Street Intersection / Jughandle
  • Ramp roadway construction continues.
  • Ramp structure construction to southbound Route 440 continues.
Ramp Area East of Route 440
  • New ramp construction continues.