03/31/17: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering 14A): renovation of existing Toll Utility Building continues.
  • Reconstruction of Toll Lanes 8-10 continues.
  • During the weekend of 04/07/17, Toll Lanes 8, 9 & 10 will be reopened.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • Widening construction on the ramps to and from the westbound and eastbound HCE is complete to the extent possible and the final alignment has been implemented. Asphalt resurfacing of the ramps will be performed in 2017.
  • Local street level work at Garfield, Avenue C and JFK Boulevard bridges will resume in the Spring of 2017. This work will be supported by Jersey City and Bayonne Police as needed.
Avenue E / Proposed Roundabout
  • New roadway construction on Avenue E near 53rd Street continues.
  • Deep bridge foundation construction in dedicated work zones continues. This work will be supported by Bayonne Police as needed.
  • New bridge pier construction in dedicated work zones continues.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Traffic was shifted onto the new Connector Bridge in a two-way temporary traffic pattern. Please CLICK HERE for graphic.
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited. Please CLICK HERE for shuttle bus pamphlet.
Route 440 and Pulaski Street Intersection / Jughandle
  • Ramp roadway construction continues.
  • Median barrier construction on Route 440 continues.
  • Ramp structure construction to southbound Route 440 continues.
  • During the week of 04/17/17, northbound Route 440 traffic will be shifted left (two northbound lanes adjacent to median) and a work zone will be established on the right.

Ramp Area East of Route 440
  • New ramp construction continues.
  • Retaining wall construction continues.
  • Bridge deck construction on the bridge structure over Pulaski Street continues.
  • Roadway construction continues.

03/24/17: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering 14A): renovation of existing Toll Utility Building continues.
  • Reconstruction of Toll Lanes 8-10 continues.
  • During the weekend of 04/07/17, Toll Lanes 8, 9 & 10 will be reopened.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • Widening construction on the ramps to and from the westbound and eastbound HCE is complete to the extent possible and the final alignment has been implemented. Asphalt resurfacing of the ramps will be performed in 2017.
  • Local street level work at Garfield, Avenue C and JFK Boulevard bridges will resume in the Spring of 2017. This work will be supported by Jersey City and Bayonne Police as needed.
Avenue E / Proposed Roundabout
  • New roadway construction on Avenue E near 53rd Street continues.
  • Deep bridge foundation construction in dedicated work zones continues. This work will be supported by Bayonne Police as needed.
  • New bridge pier construction in dedicated work zones continues.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Traffic was shifted onto the new Connector Bridge in a two-way temporary traffic pattern. Please CLICK HERE for graphic.
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited. Please CLICK HERE for shuttle bus pamphlet.
Route 440 and Pulaski Street Intersection / Jughandle
  • Ramp roadway construction continues.
  • Median barrier construction on Route 440 continues.
  • Ramp structure construction to southbound Route 440 continues.
  • During the week of 04/17/17, northbound Route 440 traffic will be shifted left (two northbound lanes adjacent to median) and a work zone will be established on the right.
Ramp Area East of Route 440
  • New ramp construction continues.
  • Retaining wall construction continues.
  • Bridge deck construction on the bridge structure over Pulaski Street continues.

03/17/17: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering 14A): renovation of existing Toll Utility Building continues.
  • Reconstruction of Toll Lanes 8-10 continues.
  • A new traffic pattern was implemented at the Toll Plaza on 2/10/17. Please CLICK HERE for graphic.
  • On Saturday 03/18/17, from 6:30AM to 2:30PM, rehabilitation work within the Toll Plaza area will be performed in a dedicated work zone. There will be no lane closures associated with this work. Please note that lane designations for cash and EZ Pass may be temporarily adjusted to prevent delays.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • Widening construction on the ramps to and from the westbound and eastbound HCE is complete to the extent possible and the final alignment has been implemented. Asphalt resurfacing of the ramps will be performed in 2017.
  • Local street level work at Garfield, Avenue C and JFK Boulevard bridges will resume in the Spring of 2017. This work will be supported by Jersey City and Bayonne Police as needed.
Avenue E / Proposed Roundabout
  • New roadway construction on Avenue E near 53rd Street continues.
  • Deep bridge foundation construction in dedicated work zones continues. This work will be supported by Bayonne Police as needed.
  • New bridge pier construction in dedicated work zones continues.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Traffic was shifted onto the new Connector Bridge in a two-way temporary traffic pattern. Please CLICK HERE for graphic.
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited. Please CLICK HERE for shuttle bus pamphlet.
Route 440 and Pulaski Street Intersection / Jughandle
  • Ramp roadway construction continues.
  • Median barrier construction on Route 440 continues.
  • Ramp structure construction to southbound Route 440 continues.
Ramp Area East of Route 440
  • New ramp construction continues.
  • Retaining wall construction continues.
  • Bridge deck construction on the bridge structure over Pulaski Street continues.

Traffic Advisory: March 18, 2017

On Saturday 03/18/17, from 6:30AM to 2:30PM, rehabilitation work within the Toll Plaza area will be performed in a dedicated work zone. There will be no lane closures associated with this work. Please note that lane designations for cash and EZ Pass may be temporarily adjusted to prevent delays.

03/10/17: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering 14A): renovation of existing Toll Utility Building continues.
  • Reconstruction of Toll Lanes 8-10 continues.
  • A new traffic pattern was implemented at the Toll Plaza on 2/10/17. Please CLICK HERE for graphic.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • Widening construction on the ramps to and from the westbound and eastbound HCE is complete to the extent possible and the final alignment has been implemented. Asphalt resurfacing of the ramps will be performed in 2017.
  • Local street level work at Garfield, Avenue C and JFK Boulevard bridges will resume in the Spring of 2017. This work will be supported by Jersey City and Bayonne Police as needed.
Avenue E / Proposed Roundabout
  • New roadway construction on Avenue E near 53rd Street continues.
  • Deep bridge foundation construction in dedicated work zones continues. This work will be supported by Bayonne Police as needed.
  • New bridge pier construction in dedicated work zones continues.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Traffic was shifted onto the new Connector Bridge in a two-way temporary traffic pattern. Please CLICK HERE for graphic.
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited. Please CLICK HERE for shuttle bus pamphlet.
Route 440 and Pulaski Street Intersection / Jughandle
  • Ramp roadway construction continues.
  • Median barrier construction on Route 440 continues.
  • Ramp structure construction to southbound Route 440 continues.
Ramp Area East of Route 440
  • New ramp construction continues.
  • Retaining wall construction continues.
  • Bridge deck construction on the bridge structure over Pulaski Street continues.

Traffic Advisory: March 9-10, 2017

During the evenings of 03/09/17 and 03/10/17, nighttime detours of northbound Route 440 will be required immediately north of Pulaski Street, 8:00PM to 4:00AM, for bridge structural steel erection. All northbound Route 440 traffic will be diverted eastbound on Pulaski Street to Port Jersey Boulevard and onto either northbound Route 440 or the Turnpike. Work will be supported by Bayonne PD.

Traffic Advisory: March 8, 2017

On Wednesday, 03/08/17, a daytime detour of northbound Avenue E will be used, 10:00AM to 2:00PM, between 50th Street and 51st Street. During this period, northbound Avenue E traffic will be diverted to Broadway to accommodate bridge structural steel erection. This work will be supported by Bayonne Police.

03/03/17: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering 14A): renovation of existing Toll Utility Building continues.
  • Reconstruction of Toll Lanes 8-10 continues.
  • A new traffic pattern was implemented at the Toll Plaza on 2/10/17. Please CLICK HERE for graphic.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • Widening construction on the ramps to and from the westbound and eastbound HCE is complete to the extent possible and the final alignment has been implemented. Asphalt resurfacing of the ramps will be performed in 2017.
  • Local street level work at Garfield, Avenue C and JFK Boulevard bridges will resume in the Spring of 2017. This work will be supported by Jersey City and Bayonne Police as needed.
Avenue E / Proposed Roundabout
  • Continue new roadway construction on Avenue E near 53rd Street.
  • Continue deep bridge foundation construction in dedicated work zones. This work will be supported by Bayonne Police as needed.
  • On 03/08/17, a daytime detour of northbound Avenue E will be used, 10:00AM to 2:00PM. During this period, northbound Avenue E traffic, between 50th Street and 51st Street, will be diverted to Broadway to accommodate bridge structural steel erection. The expected duration of the detour is four (4) hours.  This work will be supported by Bayonne Police.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Traffic was shifted onto the new Connector Bridge in a two-way temporary traffic pattern. Please CLICK HERE for graphic.
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited. Please CLICK HERE for shuttle bus pamphlet.
Route 440 and Pulaski Street Intersection / Jughandle
  • Ramp roadway construction continues.
  • Continue new bridge pier constructi