01/27/17: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering 14A): renovation of existing Toll Utility Building continues.
  • Reconstruction of Toll Lanes 11 & 12 continues.
  • During the weekend of 02/03/17, Toll Lanes 11-13 will open and Toll Lanes 8-10 will close.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • Widening construction on the ramps to and from the westbound and eastbound HCE is complete to the extent possible and the final alignment has been implemented. Asphalt resurfacing of the ramps will be performed in 2017.
  • Local street level work at Garfield, Avenue C and JFK Boulevard bridges will resume in the Spring of 2017. This work will be supported by Jersey City and Bayonne Police as needed.
  • During the weeks of 01/23/17 and 01/30/17, new VMS and other remaining sign structures will be installed at night on the Hudson County Extension. Lane closures and traffic slowdowns will be utilized to perform the work. Work to be supported by NJ State Police.
Avenue E / Proposed Roundabout
  • Continue new roadway construction on Avenue E near 53rd Street.
  • Continue deep bridge foundation construction in dedicated work zones. This work will be supported by Bayonne Police as needed.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Traffic was shifted onto the new Connector Bridge in a two-way temporary traffic pattern. Please CLICK HERE for graphic.
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited. Please CLICK HERE for shuttle bus pamphlet.
  • On Saturday, 01/28/17, the southbound Route 440 Jughandle at Pulaski Street will be temporarily closed, 7:00AM to 4:00PM, for bridge demolition operations.  Traffic wishing to go to Pulaski Street or northbound Route 440 will be detoured to 30th Street. Work will be supported by Bayonne Police.
  • During the week of 01/30/17, bridge demolition work will be performed in the Route 440 Jughandle Island during the day.  Work will be supported by Bayonne PD.
  • During the weeks of 01/30/17 and 02/06/17, bridge demolition operations will be performed at night over southbound and northbound Route 440 respectively. Work will be supported by Bayonne PD.
Route 440 and Pulaski Street Intersection / Jughandle
  • Ramp roadway construction continues.
  • Continue new bridge pier construction for the new structure to southbound Route 440.
Ramp Area East of Route 440
  • New ramp construction continues.
  • Retaining wall construction continues.
  • Bridge deck construction on the bridge structure over Pulaski Street continues.

Traffic Advisory: Weekend of January 28, 2017

On Saturday, 01/28/17, 12:01AM to 4:00PM, the southbound Route 440 Jughandle at Pulaski Street will be closed for bridge demolition operations. Jughandle traffic will be detoured to the Prospect Avenue and 32nd Street Jughandle. Work will be supported by Bayonne Police.
NOTE:  Previously forecasted disruptions during the weekend of 01/28/17 to NJ Transit’s Hudson-Bergen Light Rail services between 34th Street station in Bayonne and Danforth Avenue station in Jersey City will not be realized. Light Rail train service will not be impacted during this weekend.

01/20/17: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering 14A): renovation of existing Toll Utility Building continues.
  • Reconstruction of Toll Lanes 11 & 12 continues.
  • During the weekend of 02/03/17, Toll Lanes 11-13 will open and Toll Lanes 8-10 will close.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • Widening construction on the ramps to and from the westbound and eastbound HCE is complete to the extent possible and the final alignment has been implemented. Asphalt resurfacing of the ramps will be performed in 2017.
  • Local street level work at Garfield, Avenue C and JFK Boulevard bridges will resume in the Spring of 2017. This work will be supported by Jersey City and Bayonne Police as needed.
  • During the week of 01/23/17, new VMS and other remaining sign structures will be installed at night on the Hudson County Extension. Lane closures and traffic slowdowns will be utilized to perform the work. This work will be supported by NJ State Police.
Avenue E / Proposed Roundabout
  • Continue new roadway construction on Avenue E near 53rd Street.
  • Continue deep bridge foundation construction in dedicated work zones. This work will be supported by Bayonne Police as needed.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Traffic was shifted onto the new Connector Bridge in a two-way temporary traffic pattern. Please CLICK HERE for graphic.
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited. Please CLICK HERE for shuttle bus pamphlet.
  • During the weekends of 01/21/17 and 01/28/17, NJ Transit Light Rail Service between 34th Street Station in Bayonne and Danforth Avenue Station in Jersey City will be maintained via NJ Transit bus service from 3:00AM Saturday morning through 3:00AM Monday morning. During this period, bridge demolition will be performed over the NJ Transit and Conrail train tracks.

    Please CLICK HERE for PDF.
  • On Saturday, 01/28/17, the southbound Route 440 Jughandle at Pulaski Street will be temporarily closed, 7:00AM to 4:00PM, for bridge demolition operations.  Traffic wishing to go to Pulaski Street or northbound Route 440 will be detoured to 30th Street. Work will be supported by Bayonne Police.

  • During the weeks of 01/30/17 and 02/06/17, bridge demolition operations will be performed at night over southbound and northbound Route 440 respectively. Work will be supported by Bayonne Police.
  • During the week of 01/30/17, bridge demolition work will be performed in the Route 440 Jughandle island during the day. Work will be supported by Bayonne Police.
Route 440 and Pulaski Street Intersection / Jughandle
  • Ramp roadway construction continues.
  • Continue new bridge pier construction for the new structure to southbound Route 440.
Ramp Area East of Route 440
  • New ramp construction continues.
  • Retaining wall construction continues.
  • Bridge deck construction on the bridge structure over Pulaski Street continues.

Traffic Advisory: Weekend of January 21, 2017

During the weekend of 01/21/17, NJ Transit Light Rail Service between the 34th Street Station in Bayonne and Danforth Avenue Station in Jersey City will be maintained via NJ Transit bus service, from 3:00 AM Saturday morning through 3:00 AM Monday morning. During this period, bridge demolition will be performed over the NJ Transit and Conrail train tracks.
Please CLICK HERE for more information.
Thank you for your patience. If you have additional questions, please call the toll free hotline at 1-800-671-6872. Please inform the operator that you have an urgent message and you’ll receive a return call within 24-hours.

01/13/17: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering 14A): renovation of existing Toll Utility Building continues.
  • Reconstruction of Toll Lanes 11 & 12 continues.
  • During the weekend of 02/03/17, Toll Lanes 11-13 will open and Toll Lanes 8-10 will close.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • Widening construction on the ramps to and from the westbound and eastbound HCE is complete to the extent possible and the final alignment has been implemented. Asphalt resurfacing of the ramps will be performed in 2017.
  • Local street level work at Garfield, Avenue C and JFK Boulevard bridges will resume in the Spring of 2017. This work will be supported by Jersey City and Bayonne Police as needed.
  • During the weeks of 01/16/17 and 01/23/17, new VMS and other remaining sign structures will be installed at night on the Hudson County Extension. Lane closures and traffic slowdowns will be utilized to perform the work. This work will be supported by NJ State Police.
Avenue E / Proposed Roundabout
  • Continue new roadway construction on Avenue E near 53rd Street.
  • Continue bridge demolition operations along northbound Avenue E, between 51st Street and 53rd Street. This work will be supported by Bayonne Police as needed.
  • Continue deep bridge foundation construction in dedicated work zones.
  • On 01/18/17, from 10:00AM to 2:00PM, the Roundabout access to the Toll Plaza from southbound Avenue E immediately south of 52nd Street will be temporarily closed. Access to the Toll Plaza will be shifted immediately south of 51st Street. This temporary traffic change is being made to accommodate deep bridge foundation construction. The traffic alignment and Toll Plaza access via the Roundabout will be restored at 2:00PM. Work will be supported by Bayonne Police.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Traffic was shifted onto the new Connector Bridge in a two-way temporary traffic pattern. Please CLICK HERE for graphic.
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited. Please CLICK HERE for shuttle bus pamphlet.
  • During the weeks of 01/09/17 and 01/16/17, bridge demolition will be performed in a dedicated work zone adjacent to Conrail’s Industrial Track near the Route 440 Jughandle to Pulaski Street.
  • During the weekends of 01/21/17 and 01/28/17, NJ Transit Light Rail Service between 34th Street Station in Bayonne and Danforth Avenue Station in Jersey City will be maintained via NJ Transit bus service from 3:00AM Saturday morning through 3:00AM Monday morning. During this period, bridge demolition will be performed over the NJ Transit and Conrail train tracks.

    Please CLICK HERE for PDF.
  • During the week of 01/23/17, bridge demolition work will be performed in the Route 440 Jughandle Island during the day. Work will be supported by Bayonne Police.
  • During the weeks of 01/30/17 and 02/06/17, bridge demolition operations will be performed at night over southbound and northbound Route 440 respectively.
Route 440 and Pulaski Street Intersection / Jughandle
  • Ramp roadway construction continues.
  • Continue new bridge pier construction for the new structure to southbound Route 440.
Ramp Area East of Route 440
  • New ramp construction continues.
  • Retaining wall construction continues.
  • During the week of 01/23/17, bridge deck construction on the bridge structure over Pulaski Street will begin.

01/06/17: Construction Update

The following work is scheduled over the next three weeks:
Toll Plaza
  • East side (entering 14A): renovation of existing Toll Utility Building continues.
  • Reconstruction of Toll Lanes 11 & 12 continues.
Ramps between the Toll Plaza and the Hudson County Extension (HCE)
  • Widening construction on the ramps to and from the westbound and eastbound HCE is complete to the extent possible and the final alignment has been implemented. Asphalt resurfacing of the ramps will be performed in 2017.
  • Local street level work at Garfield, Avenue C and JFK Boulevard bridges will resume in the Spring of 2017. This work will be supported by Jersey City and Bayonne Police as needed.
Avenue E / Proposed Roundabout
  • Continue new roadway construction on Avenue E near 53rd Street.
  • Continue bridge demolition operations along northbound Avenue E, between 51st Street and 53rd Street. This work will be supported by Bayonne Police as needed.
  • Continue deep bridge foundation construction in dedicated work zones.
Connector Bridge (Bridge from the Toll Plaza to Port Jersey Boulevard)
  • Traffic was shifted onto the new Connector Bridge in a two-way temporary traffic pattern. Please CLICK HERE for graphic.
  • Pedestrian usage of the bridge for access to and from Port Jersey Boulevard continues to be prohibited. Please CLICK HERE for shuttle bus pamphlet.
  • During the weeks of 01/09/17 and 01/16/17, bridge demolition will be performed in a dedicated work zone adjacent to Conrail’s Industrial Track near the Route 440 Jughandle to Pulaski Street.
  • During the weekends of 01/21/17 and 01/28/17, NJ Transit Light Rail Service between 34th Street Station in Bayonne and Danforth Avenue Station in Jersey City will be maintained via NJ Transit bus service from 3:00AM Saturday morning through 3:00AM Monday morning. During this period, bridge demolition will be performed over the NJ Transit and Conrail train tracks.

    Please CLICK HERE for PDF.
Route 440 and Pulaski Street Intersection / Jughandle
  • The southbound Route 440 Jughandle at Pulaski Street has been reduced to a single lane and a median work zone has been established in Route 440.
  • Ramp roadway construction continues.
  • Continue new bridge pier construction for the new structure to southbound Route 440.
Ramp Area East of Route 440
  • New ramp construction continues.
  • Retaining wall construction continues.